The Company provides services in feasibility studies, detailed engineering survey and design, construction supervision, investigation, design, implementation and operation.
Works completed by the firm
S. N |
Name of Project Completed |
Client |
2 |
DPR of nine number of Motorable bridge in Rupandehi, Palpa and Arghakhanchi District |
DOR/ Bridge Unit , Babarmahal, Kathmandu |
3 |
Catalyzing Ecosystem Restoration for resilent natural capital and rural livelihood in degraded forest and rangeland of Nepal |
MOSTE, Singhadurbar Kathamndu |
4 |
Implementation of climate change adaptation in Hariyo Ban Program |
USAID/WWF |
5 |
Regional Consultation Workshops On Master Plan For Forestry Sector (Mpfs) Review And New Forestry Sector Strategy Formulation Process |
MSFP, Babarmahal |
6 |
Identify and Priorities Forestry Policy and strategy |
MSFP, Babarmahal |
7 |
Study of Sildujure Landslide in Kaski District |
|
8 |
Catalyzing Ecosystem Restoration for resilent natural capital and rural livelihood in degraded forest and rangeland of Nepal |
MOSTE, Singhadurbar Kathamndu |
9 |
Survey, Design and Construction Supervision of Earthquake Effected 3 School Building in Dhading |
The British School Lalitpur |
Rural Roads
S. N |
Name of Project Completed |
Client |
1 |
Survey and Design and detailed project report preperation of Earthen road in Udayapur District |
DDC, Udayapur |
2 |
Walkover (Alignment) survey, Detailed Project Report (DPR), Initial Environmental Examination (IEE) & Resettlement Plan of the following road sup-projects completed:-
|
RRRSDP. Jhapa |
3 |
Walkover (Alignment) survey, Detailed Project Report (DPR), Initial Environmental Examination (lEE) & Resettlement Plan of the following road sup-projects completed:- (i) Lele-Chandanpur Road, (ii) Baguwa –Pyutar-Asrang, (iii)Dalchoki-Ikudol Road, • Construction supervision & evaluation of following construction Project:- Detailed Engineering Survey, Soil Investigation, Hydrological Analysis, Detailed Design as well as Preparation of Detail Project Report (DPR) of Khani Khola Bridge, Length 44 m. |
RRRSDP. Lalitpur |
4 |
Rural Road Inventory |
DDC Surkhet |
5 |
Detail Survey, Design and Report Preperation work of Bahanal-Sirseni Rural Road |
DDC, Pyuthan |
6 |
Rural Road Inventory |
DDC, Lamjung |
7 |
Review of Detail survey, design and Estimate of Puspa Lal Marga (15 km) |
DDC, Bardiya |
8 |
Detailed Survey, Design and Report Preperation work of Ghumsi-Chisapani Rural Road |
DDC, Syangja |
9 |
Survey, Design and Estimate of Khagalpalati-Dolansa Rural Road |
DDC Sindupalchowk |
10 |
Survey Design and Report Preperation of Dhuseni-Daribote road |
DDC Ilam |
11 |
Detail Surveying, Detail Designing and Estimating Barabhis-Kuldevimandu-Aatichaur 22.7 km road at Bajura |
DRSP |
12 |
Detail Surveying, Detail Designing and Estimating Khaniya Kharka - Kamarebhangyang Road at Sindhuli |
DRSP |
13 |
Detail Surveying, Detail Designing and Estimating Pipal Bhanjyang-Haitar Road at Sindhuli |
DRSP |
14 |
Preparation of district road Bardiya district |
DDC, Bardiya |
15 |
Preparation of district road inventory of rural roads in Banke district |
DDC Banke |
16 |
Preparation of district road inventory of rural roads and GIS mapping of the same in Kaiali district |
DDC Kailali |
17 |
Preparation of district road inventory of rural roads and GIS mapping of the same in Surkhet district |
DDC Surkhet |
18 |
Detail surveying, designing and report preparation of motorable bridge at Marsyangdi River in Manang. |
DDC, Manang |
19 |
Detail Surveying, Detail Designing and Estimating of earthern road at Sindhuli |
RRRSDP/DoLIDAR |
20 |
Detail Surveying, Detail Designing and Estimating of approach road and Bridge over Sani Bheri at Rukum and Geological Study of the same. |
TBSU, DoLIDAR |
21 |
Detail Surveying, Detail Designing and Estimating of Maldhunga Beni Road at Myagdi |
DDC, Myagdi |
22 |
Detail Surveying, Detail Designing and Estimating of Janata Sadak Road at Parsa |
DDC, Parsa |
23 |
Detail Survey, Detail Designing and Estimating of Chame-Khansar Road at Manang |
DDC, Manang |
24 |
Detail Surveying, Detail Designing and Estimating of Road 70 KM at Nuwakot |
DDC, Nuwakot |
Bridges (Trial and Motorable)
S. N |
Name of Project Completed |
Client |
1 |
DPR of nine number of Motorable bridge in Rupandehi, Palpa and Arghakhanchi District |
DOR/ Bridge Unit , Babarmahal, Kathmandu |
2 |
DPR of Brahmayeni River Motorable Bridge at Bhaktapur |
DDC, Bhaktapur |
3 |
Suspension Bridge over Nachair-Tangmro River |
SBD, Pulchowk |
4 |
IEE of Ambote River , Dhulikhel |
DDC, Kavre |
5 |
Detail Survey, Design, and Report preparation of Suspension Bridge over Bering Khola, Jhapa |
Dolidar |
6 |
Consultying Service for Initial Environment Examination report for bridge over Andheri Khola, Sindupalchowk |
DDC, Sindhupalchowk |
7 |
Consultying Service for Initial Environment Examination report for bridge over Sukajor Khola, Manthali |
DDC, Ramechhap |
8 |
Detail surveying, designing and report preparation of motorable bridge at Mai Khola in Ilam.
|
DDC, Ilam |
9 |
Detail surveying, designing and report preparation of motorable bridge at Hapur River in Dang.
|
DoLIDAR |
10 |
Detail surveying, designing and report preparation of motorable bridge at Marsyangdi River in Manang. |
DDC, Manang |
11 |
Detail Surveying, Detail Designing and Estimating of Trail Bridge
|
Various (Ministry of peace and rehabilitation |
12 |
Detail Surveying, Detail Designing and Estimating of Trail Bridges at Jhapa |
TBSU. DoLIDAR |
13 |
Detail Surveying, Soil Investigation, Designing and Estimateing of Motorable Bridge at Mohiya River of Rupandehi |
DDC Rupandehi |
14 |
Detail Surveying, Soil Investigation, Designing and Estimateing of Motorable Bridge at Mohana Rive of Kailali |
DDC, Kailali |
15 |
Surveying, Designing and Estimating of Suspension Bridge (1 Number) |
DDC Darchula
|
16 |
Surveying, Designing and Estimating of Suspension Bridges (1 Number) |
Suspension Bridge Division, Pulchowk |
17 |
Surveying, Design and Estimating of Suspension Bridges (2 Numbers) |
DDC, Makawanpur
|
18 |
Surveying, Design and Estimating of Suspension Bridges (6 Numbers) |
Suspension Bridge Division, Pulchowk |
Irrigation
S. N |
Name of Project Completed |
Client |
1 |
Study of two Medium Scale Irrigation in Rupandehi Districts |
WRID – 6, Rupandehi |
2 |
Study of two Small Scale Irrigation in Bajhang Districts |
FWRID Division, Bajhang |
3 |
DFS of Singare Gad Irrigation Sub Project |
FWRID Division 2, Doti |
4 |
DFS of Kolane Chappal Dhar Irrigation Project, Baitadi |
FWRID Division 3, Baitadi |
5 |
DFS of Sirsha Irrigation Project |
FWRID Divison 2, Dadeldhura |
6 |
DFS of Majh Kulo Irrigation Project |
FWDID, Dhangadi |
7 |
DFS for Dhimaula Irrigation Cannal |
F.W.I.D.Divison 2, Dadeldhura |
8 |
DFS for Bhalukhola Irrigation Cannal |
F.W.I.D.Divison 2, Doti |
9 |
Preperation of Approach Mannual for Deveplpoment od Small Irrigation System. |
DoLIDAR |
10 |
Detail Surveying, Detail Designing and Estimating irrigation canal at Aachham |
Far Western Regional Irrigation Directorate, Dhangadhi |
11 |
Detail Surveying, Detail Designing and Estimating of 8 km long irrigation canal at Doti |
Far Western Regional Irrigation Directorate, Dhangadhi |
Approach Manual and Master Plan Preparation
S. N |
Name of Project Completed |
Client |
1 |
Preparation of resettlement plan of Bamti village in Ramechhap district |
DoLIDAR
|
2 |
Preparation of Approach manual for small irrigation projects |
DoLIDAR |
3 |
Preparation of Approach manual for rural water supply and sanitation planning, implementation, reconstruction and rehabilitation |
DoLIDAR |
4 |
Preparation of development master plan of Gajedi Lake at Rupandehi |
DDC, Rupandehi |
5 |
Preparation of Master Plan and detailed design and cost estimate of Anekot Model Village at Kavre |
Ministry of peace and rehabilitation |
6 |
Preparation of Master Plan, designing and drawing of each structures cost estimating |
Bal Bishram Community School, Kathmandu |
7 |
Preparation of Transport Master Plan of Manang District |
DDC, Manang |
Climate Change, Forestry, Land Slides etc
S. N |
Name of Project Completed |
Client |
1 |
Catalyzing Ecosystem Restoration for resilient natural capital and rural livelihood in degraded forest and rangeland of Nepal |
MOSTE, Singhadurbar Kathamndu |
2 |
Implementation of climate change adaptation in Hariyo Ban Program |
USAID/WWF |
3 |
Regional Consultation Workshops On Master Plan For Forestry Sector (Mpfs) Review And New Forestry Sector Strategy Formulation Process |
MSFP, Babarmahal |
4 |
Identify and Priorities Forestry Policy and strategy |
MSFP, Babarmahal |
5 |
Study of Sildujure Landslide in Kaski District |
|
Micro Hydropowers
S. N |
Name of Project Completed |
Client |
1 |
Biurabari MHP (15 kW) |
AEPC/ESAP |
2 |
Bhitra Khola MHP (32kW) |
AEPC/ESAP |
3 |
Simtara Khola MHP (52kW) |
AEPC/ESAP |
4 |
Dhoreni Khola MHP (45kW) |
AEPC/ESAP |
5 |
Baghamare MHP (45kW) |
AEPC/ESAP |
6 |
Similarly, Other 3 project |
AEPC/ESAP |